Sunday, January 13, 2013

The Airbus A350 is a family of long-range, wide-body jet airliners 1.13.2013.

The Airbus A350 is a family of long-range, wide-body jet airliners under development by European aircraft manufacturer Airbus.[Nb 1] The A350 will be the first Airbus with both fuselage and wing structures made primarily of carbon fibre-reinforced polymer.[5] It will carry 250 to 350 passengers in three-class seating, depending on variant.
The A350 was originally conceived as a variant of the A330 with few changes, to compete with the Boeing 787 Dreamliner and the larger Boeing 777. The design was unanimously rejected by prospective customers and Airbus was forced to revise their initial proposal, but airlines voiced support for a complete overhaul. The eventual proposal incorporated major changes, which Airbus says will be more fuel-efficient, with up to 8% lower operating cost than the Boeing 787.[5]
The redesigned A350 was marketed by Airbus as the A350 XWB, where the XWB stands for Extra Wide Body. The launch customer for the A350 is Qatar Airways, which ordered 80 aircraft across the three variants.[6] Development costs are projected to be 12 billion (US$15 billion or £10 billion).[7] The airliner is scheduled to enter airline service in mid 2014.[2] As of 20 January 2012 (2012 -01-20), 561 orders had been placed.[8]

Contents

[hide]

 Development

Early designs

When Boeing announced their Boeing 787 Dreamliner programme, the company said that the lower operating costs of the 787 would make it a serious threat to the Airbus A330. In public announcements, Airbus initially rejected this claim, stating that the 787 was just a reaction to the A330, and that no response was needed for the 787. Airlines pushed Airbus to provide a competitor, as Boeing had committed the 787 to have 20% lower fuel consumption than the Boeing 767.
Airbus initially proposed the A330-200Lite, a simple derivative of the A330, which would feature improved aerodynamics and engines similar to those on the 787.[9] The company planned to announce this version at the 2004 Farnborough Airshow, but did not proceed.[9] On 16 September 2004, then-Airbus president and CEO Noël Forgeard confirmed the consideration of a new project during a private meeting with prospective customers.[9] Forgeard did not give a project name, and he did not state whether it would be an entirely new design or a modification of an existing product. The airlines were not satisfied, and Airbus committed €4 billion to a new airliner design.[9] The original version of the A350 superficially resembled the A330 due to its common fuselage cross-section and assembly. A new wing, engines and a horizontal stabiliser were to be coupled with new composite materials and production methods applied to the fuselage to make the A350 an almost all-new aircraft.[9] On 10 December 2004, the boards of EADS and BAE Systems, then the shareholders of Airbus, gave Airbus an "authorisation to offer (ATO)", and formally named it the A350.[9][10]
On 13 June 2005 at the Paris Air Show, Middle Eastern carrier Qatar Airways announced that they have placed an order for 60 A350s. In September 2006 the airline signed an memorandum of understanding with General Electric to launch the GEnx-1A-72 for the aircraft.[11][12][13] Emirates decided against placing an order for the initial version of the A350 because of weaknesses in the design,[14][15] but has since ordered A350 XWBs.[16]
On 6 October 2005, full industrial launch of the programme was announced with an estimated development cost of around €3.5 billion.[9] This version of the A350 was planned to be a 250- to 300-seat twin-engine wide-body aircraft derived from the design of the existing A330. Under this plan, the A350 would have modified wings and new engines, while sharing the same fuselage cross-section as its predecessor. As a result of a controversial design, the fuselage was to consist primarily of Al-Li, rather than the carbon-fiber-reinforced polymer (CFRP) fuselage on the 787. It was to see entry in two versions: the A350-800 capable of flying 8,800 nmi (16,300 km) with typical passenger capacity of 253 in 3-class configuration and the 300-seat (3-class) A350-900 with 7,500 nmi (13,900 km) range. It was designed to be a direct competitor to the 787-9, and 777-200ER.[9]
Airbus faced almost immediate criticism on the A350 project from the heads of two of their largest customers, International Lease Finance Corporation (ILFC) and GE Capital Aviation Services (GECAS). On 28 March 2006, in the presence of hundreds of top airline executives, ILFC President Steven F. Udvar-Hazy lambasted Airbus' strategy in bringing to market what they saw as "a Band-aid reaction to the 787", a sentiment that was echoed by GECAS president Henry Hubschman. Udvar-Hazy called on Airbus to bring a clean-sheet design to the table, or risk losing most of the market to Boeing.[17][18] Several days later Chew Choon Seng, then CEO of Singapore Airlines (SIA), made a similar comment: "Having gone to the trouble of designing a new wing, tail, cockpit" and adding advanced new materials, Airbus "should have gone the whole hog and designed a new fuselage."[19] At the time, SIA was reviewing bids for the 787 and A350. Airbus responded by stating they were considering improvements for the A350 to satisfy customer demands.[20] At the same time, Airbus' then-CEO Gustav Humbert suggested that there would be no quick fixes: "Our strategy isn't driven by the needs of the next one or two campaigns, but rather by a long-term view of the market and our ability to deliver on our promises."[21]

 Redesign and launch

Consequent to that criticism, in mid-2006 Airbus undertook a major review of the A350 concept. The proposed new A350 with a wider fuselage cross-section has become more of a competitor to the larger Boeing 777 likewise to some models of the Boeing 787 Dreamliner. The new A350 fuselage allows 10-abreast high-density seating configuration.[22][23] The A330 and previous iterations of the A350 would only be able to accommodate eight passengers per row in normal configurations. The 787 can accommodate 8 or 9 passengers per row, while the 777 can accommodate nine passengers per row, with some airlines using ten-abreast seating. The A350 cabin is 12.7 cm (5.0 in) wider at the eye level of a seated passenger than the competing 787,[24] and 28 cm (11 in) narrower than the Boeing 777, its other competitor. (See Wide-body aircraft for a comparison of cabin widths and seating.) All A350 passenger models will have a range of at least 8,000 nmi (15,000 km).
Mock-up of aircraft cabin with white seats, indirect lighting and a bluish hue
Interior mock-up of the Business Class of the A350 XWB
On 14 July 2006, during the Farnborough Airshow, Airbus announced that the redesigned aircraft would be called A350 XWB (Xtra-Wide-Body).[25] There was some previous speculation that the revised aircraft would be called the Airbus A370 or A280, with Airbus going as far as accidentally publishing an advert referring to the aircraft as the "A280" on the Financial Times website. Within four days, Airbus achieved their first sale of the re-designed A350 when Singapore Airlines announced an order for 20 A350XWBs with options of a further 20. CEO Chew Choon Seng said that "it is heartening that Airbus has listened to customer airlines and has come up with a totally new design for the A350."[26]
On 1 December 2006 the Airbus board of directors approved the industrial launch of the A350-800, -900 and -1000.[27][28] The delayed decision on formal launch was a result of delays of the Airbus A380[29] and discussions about how the development would be funded. EADS CEO Thomas Enders stated that the A350 programme was not a certainty, citing EADS/Airbus' stretched resources.[30][31] However, it was decided programme costs are to be borne mainly from cash-flow. First delivery for the -900 was scheduled for mid-2013, with the -800 and -1000 following on, respectively, 12 and 24 months later.[27] At a 4 December 2006 press conference, a few new technical details of the A350 XWB design were revealed, but no new customers were identified. John Leahy indicated existing A350 contracts were under re-negotiation due to increases in prices compared to the original A350s contracted. On 4 January 2007, Airbus announced that Pegasus Aviation Finance Company had placed the first firm order for the A350 XWB with an order for two aircraft.[32]
The change to the XWB design imposed a two-year delay into the original timetable and almost doubled development costs from $5.3 billion to approximately $10 billion (£4.9 billion to £9.5 billion or €5.5 billion to €9.7 billion).[33][34] The total development cost for the A350 was estimated at $15 billion by Reuters (€12 billion or £10 billion).[35] Although the mid-2013 delivery date of the A350 remains unchanged, longer than anticipated development activities for the aircraft have forced Airbus to delay the final assembly and first flight of the aircraft to the third quarter of 2011 and second quarter of 2012 respectively. As such, flight testing will be compressed from the original 15 months to a 12-month schedule. A350 programme chief Didier Evrard stressed that the delays only affect the A350-900 and that the A350-800 and A350-1000 schedules remain unchanged.[36] On 12 November 2010, EADS CFO Peter Ring stated that the delivery date had slipped from mid-2013 to the second half of that year. Ring said the major reason for the schedule change is that the "transition phase from design to manufacturing is a bit longer."[37]

Design phase

Artist impression of side view of jet aircraft in airline livery
Illustration of Airbus A350 XWB concept in Etihad Airways livery
Although Airbus previously suggested Boeing's use of composite materials for the 787 fuselage was premature, and that the original A350s would be made from aluminium-lithium (Al-Li), the new A350 XWB will feature large carbon fibre panels for the main fuselage skin. After facing criticism for maintenance costs,[38] Airbus confirmed in early September 2007 the adoption of composite fuselage frames for the aircraft structure.[39][40] The composite frames will feature aluminium strips to ensure the electrical continuity of the fuselage (for dissipating lightning strikes).[41] Airbus will use a full mock up fuselage to develop the wiring, a different approach from the A380, on which the wiring was all done on computers.[42]
A critical component of the all-new airliner are the engines. Rather than the bleedless configuration used on the Boeing 787, Airbus has confirmed that it will further develop a full bleed air system on the engines.[43][44][45] Rolls-Royce has agreed with Airbus to supply a new variant of the Trent engine for the A350 XWB, currently called the Trent XWB. After the low-speed wind tunnel test, Airbus froze the static thrust at sea level for all three proposed variants in the 330–420 kN (74,000–94,000 lbf) range.[46] In June 2007, Rolls-Royce announced that it had signed its biggest ever contract with Qatar Airways for the Trent XWB to power 80 A350 XWBs on order from Airbus worth $5.6 billion at list prices.[citation needed]
General Electric (GE) has stated it will not offer the GP7000 engine on the aircraft, and that previous contracts for the GEnx on the original A350 did not apply to the XWB.[47] Engine Alliance partner Pratt & Whitney seems to be at odds with GE on this, publicly stating that it is looking at an advanced derivative of the GP7000.[48] In April 2007, Airbus former chief executive Louis Gallois held face-to-face talks with senior GE management over developing a new variant of the GEnx engine for the A350 XWB.[49][50] In June 2007, Airbus' Chief Operating Officer John Leahy indicated that the A350 XWB will not feature the GEnx engine, saying that Airbus wants GE to offer a more efficient version for the new Airbus airliner.[51] Since then, largest GE engines operators Emirates, US Airways, Hawaiian Airlines and ILFC have selected the Trent XWB for their A350 orders. In May 2009, GE said that if it reaches a deal with Airbus to offer the current 787-optimised GEnx for the A350, it will only power the -800 and -900 variants. GE believes it can offer a product that outperforms the Trent 1000 and Trent XWB, but has been reluctant to support an airframe that competes directly with its GE90-115B-powered 777 variants.[52]
In January 2008, French-based Thales Group won the US$2.9 billion (€2 billion) 20-year contract to supply avionics and navigation equipment for the A350 XWB. Thales competed against Honeywell and Rockwell Collins for the flight deck supply contract.[53] US-based Rockwell Collins and Moog Inc were chosen to supply the horizontal stabiliser actuator and primary flight control actuation, respectively. The flight management system will include several new safety features.[54]
Regarding cabin ergonomics and entertainment, in 2006 Airbus had signed a firm contract with BMW for development of an interior concept for the original A350.[55] On 4 February 2010, Airbus signed a contract with Panasonic Avionics Corporation to deliver in-flight entertainment and communication (IFEC) systems for the Airbus A350 XWB.

Production and testing

The A350 XWB production programme sees extensive international collaboration and investments in new facilities. According to Flight Global, Airbus constructed 10 new factories across Western Europe and the US, with extensions carried out on 3 further sites.[56] Among the new buildings was a £570 million (US$760 million or €745 million) composite facility in Broughton, Wales, which would be responsible for the wings.[57] In June 2009, the National Assembly for Wales announced provision of a £28 million grant to provide a training centre, production jobs and money toward the new production centre.[58] Another new construction facility was the composite rudder plant in China, which was opened in early 2011.[59][60]
Airbus planned to introduce new techniques and procedures to cut assembly time in half.[61] Airbus manufactured the first structural component in December 2009.[62] Production of the first fuselage barrel began in late 2010 at its production plant in Illescas, Spain.[63][64] Construction of the first A350-900 centre wingbox was set to start in August 2010.[65]
The flight-test programme of the Rolls-Royce Trent XWB is to begin using the A380 development aircraft in early 2011, ahead of engine certification at the end of 2011. The first engine test on the Trent was made in June 2010.[66] The forward fuselage of the first A350 aircraft was delivered to the factory on 29 December 2011.[67] The final assembly of the first A350 static test model was started on 5 April 2012.[68]
In June 2011, the A350-900 was scheduled to enter service in the first half of 2014, with the -800 to enter service in mid-2016, and the -1000 in 2017.[69] In July 2012, Airbus delayed the -900's entry date by three months into the second half of 2014.[70]

 Design

In September 2007, Airbus rolled out new design advances to a gathering of 100 representatives from existing and potential XWB customers. The A350 XWB will be built on the technologies developed for Airbus A380 and will have a similar cockpit and fly-by-wire systems layout.[71] The A350 XWB will be made out of 53% composites, 19% Al/Al-Li, 14% titanium, 6% steel and 8% miscellaneous.[72] This compares to the Boeing 787 Dreamliner, which consists of 50% composites, 20% aluminium, 15% titanium, 10% steel and 5% other.[73] October 2008 was the Airbus internal goal to freeze the design and Airbus expects 10% lower airframe maintenance cost and 14% lower empty seat weight than competing aircraft.[74]
Airbus says that the new design provides a better cabin atmosphere with 20% humidity level during flight and typical cabin altitude at or below 6,000 ft (1,800 m), pressurisation at 6,000 ft (1,800 m) and flow management system that adapts cabin airflow to passenger load with draught-free air circulation.[5] Airbus is aiming to certify the A350 with 350 min ETOPS capability upon service entry.[75]

 Fuselage

Standard nine-abreast configuration mock-up of the economy class of the A350
The new XWB fuselage will have a constant width from door 1 to door 4, unlike previous Airbus aircraft, to provide maximum usable volume.[76] The double-lobe (ovoid) fuselage cross-section will have a maximum outer diameter of 5.97 m (19.6 ft), compared to 5.64 m (18.5 ft) for the A330/A340.[77] The cabin's internal diameter will be 5.61 m (18.4 ft) wide at armrest level compared with 5.49 m (18.0 ft) of the Boeing 787[78] and 5.86 m (19.2 ft) of the Boeing 777. It allows eight-abreast 2–4–2 arrangement in premium economy layout, with the seats being 49.5 cm (19.5 in) wide between 5 cm (2.0 in) wide arm rests. Airbus says that the seat width will be 1.3 cm (0.5 in) greater than a 787 seat in the equivalent configuration. In the nine-abreast, 3–3–3 standard layout, the XWB's seat width will be 45 cm (18 in) which will be 1.78 cm (0.7 in) wider than the equivalent seat layout for the Boeing 787, but 1.27 cm (0.5 in) narrower than the nine-abreast seat on the 777.[79][80] A ten-abreast high-density configuration is also available albeit at a tight 41.7 cm (16.4 in) seat width compared to a 777 ten-abreast configuration with 44.45 cm (17.5 in) seat width.[81][22] Passengers are promised more headroom, larger overhead storage space and wider panoramic windows than current Airbus models.

Wings

The A350 will feature new all-composite wings that will be common to the three proposed variants.[82] With an area of 443 m2 (4,770 sq ft)[83] it will be the largest wing ever produced for a single-deck widebody aircraft.[76] The geometric wingspan of 64.8 m (213 ft)[83] is 4.5 m (15 ft) greater than that of the A330. This is the same span as the long-range Boeing 777-200LR/777-300ER, which has slightly less area.[84] The wing tip will not sport Airbus' traditional wingtip fences, but instead will curve upwards over the final 4.4 metres (14 ft) in a "sabre-like" shape.[76] The new wing will have 31.9° of sweep,[83] helping to increase typical cruise speed to Mach 0.85 and maximum operating speed to Mach 0.89.
A new trailing-edge high-lift system has been adopted with an advanced dropped-hinge flap (similar to that of the A380), which permits the gap between the trailing edge and the flap to be closed with the spoiler.[85] The manufacturer has extensively used computational fluid dynamics and also carried out more than 4,000 hours of low- and high-speed windtunnel testing to refine the aerodynamic design,[86] achieving the final configuration of wing and winglet on the "Maturity Gate 5" on 17 December 2008.[87]
The wings are produced in the new £400M/46,000 square metres (500,000 sq ft) North Factory at Airbus Broughton, employing 650 workers, in a specialist facility constructed with £29M of support from the Welsh Assembly Government.[88]

 Nose

A350 XWB new nose and general arrangement inside forward fuselage
The XWB's nose section will adopt a configuration derived from the A380 with a forward-mounted nosegear bay and a six-panel flightdeck windscreen.[89] This differs substantially from the four-window arrangement in the original design.[90] The new nose will improve aerodynamics and enable overhead crew rest areas to be installed further forward and eliminate any encroachment in the passenger cabin. The new windscreen has been revised to improve vision by reducing the width of the centre post. The upper shell radius of the nose section has been increased. The nose is likely to be constructed from aluminium but Airbus is currently running trade-off studies considering a one-piece carbon fibre structure. According to Gordon McConnell, A350 Chief Engineer, a carbon fibre structure would need titanium reinforcements for birdstrike protection, thus the aluminium structure is the best cost-wise.[91]

 Cockpit and avionics

The revised design of the cockpit dropped the A380-sized display and adopted 38 cm (15 in) LCD screens. The new six-screen configuration will have two central displays mounted one above the other (the lower one above the thrust levers) and a single (for each pilot) primary flight/navigation display, with an adjacent on-board information system screen.[92] Airbus says the new cockpit will allow advances in navigation technology to be placed on the displays in the future plus flexibility and capacity to upload new software and to combine data from multiple sources and sensors for flight management and aircraft systems control.[93] The A350 XWB will also feature a head-up display.
The avionics will be a further development of the integrated modular avionics (IMA) concept found on the A380. The A350's IMA will manage up to 40 functions (versus 23 functions for the A380) such as undercarriage, fuel, pneumatics, cabin environmental systems, and fire detection.[90][94] Airbus says benefits will include reduced maintenance and lower weight because IMA replaces multiple processors and LRUs with around 50% fewer standard computer modules known as line-replaceable modules. The IMA runs on a 100-Mbit/s network based on the avionics full-duplex (AFDX) standard, already employed in the A380 instead of the architecture used on the A330/A340.

Powerplant

The Trent XWB family has two basic engines to power the three A350 variants. The baseline 370 kN (83,000 lbf) thrust version for the A350-900 will be derated to 330 kN (74,000 lbf) and 350 kN (79,000 lbf) for the -800, while an upgraded 432 kN (97,000 lbf) thrust version will power the A350-1000. The higher rating engine version will have some modifications to the fan module - it will be the same diameter but will run slightly faster and have a new fan blade design - and increased temperatures allowed by new materials technologies from Rolls-Royce's research.[95] The basic 248 t MTOW -800 will be offered with a 330 kN (74,000 lbf) sea-level-thrust rating, while the 279 t MTOW option will have 350 kN (79,000 lbf) thrust. Airbus also plans to offer a 'hot and high' rating option for Middle Eastern launching customers Qatar Airways, Emirates, and Etihad. This option has an increased thrust of 350 kN (79,000 lbf) at higher altitudes and temperatures.
The Trent XWB will feature a 300-centimetre (118 in) fan diameter and the design will be based on the advanced developments of the Trent 900 (Airbus A380) and Trent 1000 (Boeing 787). The Trent XWB may also benefit from the next-generation reduced acoustic mode scattering engine duct system (RAMSES), which is a noise-dampening engine nacelle intake and a carry-on design of the Airbus's "zero splice" intake liner developed for the A380.[96] Engine thrust-reversers and nacelles will be supplied by US-based Goodrich Corporation.
The A350 XWB will feature a 1,268 kW (1,700 shp) Honeywell HGT1700 auxiliary power unit,[90] which has 10% greater power density than the previous generation of Honeywell's 331 APU family. Honeywell will also supply the air management system: the bleed air, environmental control, cabin pressure control and supplemental cooling systems.[97] The ram-air turbine will be supplied by Hamilton Sundstrand and will be located in the lower surface of the fuselage.[98] The generator requirement for the ram air turbine is 100 kVA compared to 150 kVA for the A380.

 Fuel and hydraulic systems

Parker Hannifin will supply the complete fuel package: inerting system, fuel measurement and management systems, mechanical equipment and fuel pumps. The fuel tank inerting system will feature air-separation modules to generate nitrogen-enriched air that will be used to reduce the flammability of fuel vapour in the tanks.
Parker will also provide hydraulic power generation and distribution system: reservoirs, manifolds, accumulators, thermal control, isolation, software and new engine- and electric motor-driven pump designs. Parker estimates the contracts will generate more than US$2 billion (€1.5 billion or £1 billion) in revenues over the life of the programme.[99]
Mock-up of the A350 nose gear at ILA 2012

 Undercarriage

Airbus adopted a new philosophy for the attachment of the A350’s main undercarriage as part of the switch to a composite wing structure. Each main undercarriage leg is attached to the rear wing spar forward and to a gear beam aft, which itself is attached to the wing and the fuselage. To help reduce the loads further into the wing, a double side-stay configuration has been adopted. This solution resembles the design of the Vickers VC10.[100]
Airbus devised a three-pronged main undercarriage design philosophy encompassing both four- and six-wheel bogies to ensure it can keep the pavement loading within limits. The A350-800 and A350-900 will both have four-wheel bogies, although the -800's will be slightly shorter to save weight. Both will fit in the same 4.1 m (13 ft) long bay. The proposed higher weight variant, the A350-1000 (and the A350-900R, which is being proposed to British Airways, with -900 size but with sufficient fuel capacity to allow nonstop London-Sydney flights) will use a six-wheel bogey, with a 4.7 m (15 ft) undercarriage bay.[101] French-based Messier-Dowty will provide the main undercarriage for the -800 and -900 variant, and UTC Aerospace Systems will supply the -1000 variant.. The nose gear will be supplied by Liebherr-Aerospace.[102]

Variants

A350 variants
There are three variants of the A350 and all were launched in 2006.[103][104] In July 2012, the A350-900 is scheduled to enter service in the second half of 2014;[70] then the -800 in mid-2016, and -1000 in 2017.[69][105] All variants are also to be offered as corporate jets by wholly owned subsidiary Airbus Executive and Private Aviation.

A350-800

The A350-800 will seat 270 passengers in a 3-class with a 9-abreast layout. It will have a range of 15,400 km (8,300 nmi).[83] It is designed to compete with the Boeing 787-9 and to directly replace the Airbus A330-200. In January 2010 Airbus announced that the -800 would be developed as a simple shrink of the -900, incorporating minor changes to the systems and structure and share more hardware with the -900 rather than as an optimised variant as was previously planned. This increased commonality will allow a higher maximum takeoff weight, which will increase the range (or payload) of the A350-800 compared to initial plans. The change will increase fuel burn by "a few per cent", according to the programme's marketing head, Sophie Pendaries.[106]
The -800's fuselage is 10 frames shorter (six forward and four aft) than the -900 aircraft. The baseline -800 will be offered with an MTOW of 248 t (550,000 lb), MLW of 190 t (420,000 lb), MZFW of 178 t (390,000 lb), and 330 kN (74,000 lbf) thrust engines. An optional 11-tonne (24,000 lb) increase in MTOW, to 259 t (570,000 lb) with a corresponding increase of MZFW to 181 t (400,000 lb), MLW to 193 t (430,000 lb), and a higher thrust 370 kN (83,000 lbf) engine (common with -900 engine thrust) was announced by Airbus in April 2010 to be made available for customers as an option. While the increased weights compensate for the increased empty weight of the aircraft and associated minor fuel burn penalty due to maintaining commonality with -900, it also resulted in an increase in the aircraft maximum structural payload capability by 3 t (6,600 lb), or 459 km (248 nmi) of additional range.[107][108] As development continues, Airbus plans to decrease structural weight in the -800, which should be around airframe 20.[109]

 A350-900

The A350-900 is the first A350 model and seats 314 passengers in a 3-class cabin 9-abreast layout. It has a standard design range target of 15,000 km (8,100 nmi). Airbus says that the A350-900 will have a decrease of 16% MWE per seat, a 30% decrease in block fuel per seat and 25% better cash operating cost than the Boeing 777-200ER.[110]
The -900R and -900F variants also have been proposed but not yet launched. These are to feature the higher engine thrust, strengthened structure and undercarriage of the -1000.[111] Range of the "standard" A350-900R was estimated to 17,600 km (9,500 nmi), which would be boosted to about 19,100 km (10,315 nmi) by these design improvements to compete with the Boeing 777-200LR and be capable of non-stop flight from London-Heathrow to Auckland. The -900 is designed to compete with the Boeing 777-200ER and replace the Airbus A340-300. The -900R was expected to enter service in 2016.[112]

A350-1000

The A350-1000 has an 11-frame stretch over the -900[103] and will enter service after the -800. It is the largest variant of the A350 family and will seat 350 passengers in a 3-class cabin 9-abreast layout.[113] It will have range of 15,600 km (8,400 nmi). It is designed to compete with the Boeing 777-300ER and replace the Airbus A340-600.
The A350-1000 will feature a slightly larger wing than the -800/900 models; a trailing-edge extension increasing its area by 4%. This will extend the high-lift devices and the ailerons, making the chord bigger by around 400 mm, optimising flap lift performance as well as cruise performance.[103]


 Orders and deliveries

Net orders
(cumulative by year)
As of 31 October 2012 (2012 -10-31)[114]
As of October 2012, 34 customers have placed 562 firm orders for the A350 XWB.[114]
Airbus A350 firm orders
A350-800A350-900A350-1000Total firm orders
11236288562
Source: Airbus orders data as of October 2012[114]
Orders and deliveries
2006200720082009201020112012Total
Net orders203301332278-287562
Deliveries
Source: Airbus orders data as of October 2012[114]

 Specifications

Specifications are preliminary until design is finished.
ModelA350-800[106]A350-900A350-900R[115]A350-900F[115]A350-1000
Cockpit crewTwo
Seating, typical270 (3-class)
276–312 (2-class)
440 (maximum)
314 (3-class)
315–366 (2-class)
475 (maximum)
-350 (3-class)
369–412 (2-class)
550 (maximum)
Overall length60.54 m (198.6 ft)66.89 m (219.5 ft)73.88 m (242.4 ft)
Wingspan64.8 m (213 ft)
Wing area443 m2 (4,770 sq ft)~460 m2 (5,000 sq ft)
Wing sweepback31.9°
Overall height17.05 m (55.9 ft)
Fuselage width5.96 m (19.6 ft)
Fuselage height6.09 m (20.0 ft)
Cabin width5.61 m (18.4 ft)[116]
Maximum takeoff weight259 t (571,000 lb)268 t (591,000 lb)298 t (657,000 lb)308 t (679,000 lb)
Maximum landing weight[108]193 t (425,000 lb)205 t (452,000 lb)233 t (514,000 lb)
Maximum zero fuel weight[108]181 t (399,000 lb)192 t (423,000 lb)220 t (485,000 lb)
Manufacturer's empty weight115.7 t (255,074.8 lb)[117]
Maximum cargo capacity28 LD3 or 9 pallets36 LD3 or 11 pallets90 t (198,000 lb)44 LD3 or 14 pallets
Cruise speedMach 0.85 (903 km/h, 561 mph, 487 knots, at 40,000 ft/12.19 km)
Maximum cruise speedMach 0.89 (945 km/h, 587 mph, 510 knots, at 40,000 ft/12.19 km)
Maximum range
(with passengers and baggage)[108]
15,700 km (8,480 nmi)15,000 km (8,100 nmi)19,100 km (10,300 nmi)9,250 km (4,990 nmi)
Maximum cargo payload
15,600 km (8,420 nmi)
Maximum fuel capacity129,000 l (34,100 US gal)138,000 l (36,500 US gal)156,000 l (41,200 US gal)
Service ceiling43,100 ft (13.1 km)
Engines (2×)RR Trent XWB
Maximum thrust capability79,000 lbf (351 kN)84,000 lbf (374 kN)93,000 lbf (414 kN)93,000 lbf (414 kN)97,000 lbf (431 kN)
Sources: Airbus,[83][113][116] Flight Global[118]

 See also

Related development
Aircraft of comparable role, configuration and era
Related lists

 Notes

  1. ^ A consortium originally comprising European aerospace companies from the UK, France, Spain and West Germany, Airbus is now fully owned by EADS and since 2001 has been known as Airbus SAS. It is commonly known simply as Airbus though.

 References

  1. ^ "First flyable A350 XWB "MSN1" structurally complete". Airbus. 4 December 2012. http://www.airbus.com/newsevents/news-events-single/detail/first-flyable-a350-xwb-msn-001-structurally-complete/.
  2. ^ a b "Airbus advances towards first flight of A350 twinjet". Flight International. 23 Oct 2012. http://www.flightglobal.com/news/articles/airbus-advances-towards-first-flight-of-a350-twinjet-377959/.
  3. ^ "German Airbus A350 XWB Production commences" (Press release). Airbus S.A.S.. 31 August 2010. http://www.airbus.com/newsevents/news-events-single/detail/german-airbus-a350-xwb-production-commences/. Retrieved 23 May 2011.
  4. ^ a b c "New pricelist 2012". Airbus.com. 19 January 2012. http://www.airbus.com/newsevents/news-events-single/detail/new-airbus-aircraft-list-prices-for-2012/. Retrieved 19 Januari 2012.
  5. ^ a b c "Taking the lead: A350XWB presentation". EADS. December 2006. Archived from the original on 27 March 2009. http://web.archive.org/web/20090327094646/http://www.eads.com/xml/content/OF00000000400004/7/19/41508197.pdf.
  6. ^ "Airbus Orders & Deliveries: Airbus 350". Airbus. http://www.airbus.com/fileadmin/backstage/documents/orders_deliveries_table/Airbus_-_OrdersDeliveries_-_April_2011.xls. Retrieved 1 July 2011.
  7. ^ "15 bln U.S dollars for Airbus A350". Reuters. http://www.youtube.com/watch?v=NdpxatVG_mU&feature=channel. Retrieved 1 July 2011.
  8. ^ "Airbus orders and deliveries" (pdf). Airbus S.A.S. 20 January 2012. http://www.airbus.com/presscentre/corporate-information/key-documents/?eID=dam_frontend_push&docID=19650. Retrieved 20 January 2012.
  9. ^ a b c d e f g h Gunston 2009, p. 253
  10. ^ "Airbus to launch Boeing 7E7 rival." BBC News. 10 December 2004
  11. ^ "Qatar signs MoU to launch GEnx on A350". Flight International. 14 September 2005. http://www.flightglobal.com/articles/2005/09/14/201549/qatar-signs-mou-to-launch-genx-on-a350.html. Retrieved 11 November 2010.
  12. ^ "Airbus unleashes A350 for long-range twin dogfight". Flight International. 15 June 2005. http://www.flightglobal.com/articles/2005/06/15/199582/airbus-unleashes-a350-for-long-range-twin-dogfight.html. Retrieved 11 November 2010.
  13. ^ "A350 lifts off with $15bn Qatar". flightglobal.com
  14. ^ Brierley, David (18 June 2006). "Pressure mounts following attack by Emirates". The Independent (London). http://www.independent.co.uk/news/business/news/pressure-mounts-following-attack-by-emirates-404436.html. Retrieved 23 May 2011.
  15. ^ "Airbus settling on wider fuselage, composite wing as it nears A350 revamp decision". ATW Online
  16. ^ van Leeuwen, Marcel (11 November 2007). "Emirates Airline buys 70 Airbus A350s and 11 additional A380s". Aviationnews.eu. Archived from the original on 5 July 2011. http://www.aviationnews.eu/2007/11/11/emirates-airline-buys-70-airbus-a350s-and-11-additional-a380s/. Retrieved 23 May 2011.
  17. ^ Gates, D. "Airplane kingpins tell Airbus: Overhaul A350." Seattle Times, 29 March 2006
  18. ^ Hamilton, S. "Redesigning the A350: Airbus’ tough choice." Leeham Company
  19. ^ Michaels, D. and Lunsford, J. L. "Singapore Airlines Says Airbus Needs to Make A350 Improvements." The Wall Street Journal, 7 April 2006
  20. ^ "Criticism prompts Airbus to study options, CEO says." Rothman, A. Bloomberg News, 11 April 2006.
  21. ^ "Airbus Considering Improvements to A350".[dead link] Associated Press, 10 April 2006.
  22. ^ a b "Onboard well-being". Airbus S.A.S.. http://www.airbus.com/aircraftfamilies/passengeraircraft/a350xwbfamily/onboard-well-being/. Retrieved 23 May 2011.
  23. ^ Kingsley-Jones, Max (19 May 2008). "PICTURE: 10-abreast A350 XWB 'would offer unprecedented operating cost advantage'". Flight International. Archived from the original on 21 May 2011. http://www.flightglobal.com/articles/2008/05/19/223853/picture-10-abreast-a350-xwb-would-offer-unprecedented-operating-cost-advantage.html. Retrieved 24 May 2011.
  24. ^ "Airbus - A350 XWB Xtra comfort". Archived from the original on 5 February 2008. http://web.archive.org/web/20080205041546/http://www.airbus.com/en/aircraftfamilies/a350/comfort.html.
  25. ^ Gunston 2009, p. 254
  26. ^ "Singapore Airlines Orders 20 Airbus A350 XWB-900s and 9 Airbus A380s". Businesswire.com. 21 July 2006. http://www.businesswire.com/news/home/20060721005272/en/Singapore-Airlines-Orders-20-Airbus-A350-XWB-900s. Retrieved 23 May 2011.
  27. ^ a b "A350 XWB Family receives industrial go-ahead" (Press release). Airbus S.A.S.. 1 December 2006. http://www.airbus.com/newsevents/news-events-single/detail/a350-xwb-family-receives-industrial-go-ahead/. Retrieved 23 May 2011.
  28. ^ "Airbus Gets OK to Compete with Boeing 787". Chicago Sun-Times via Aircraft Maintenance Technology. 21 December 2006.
  29. ^ Norris, Guy and Max Kingsley-Jones (2 October 2006). "A380 delay puts brakes on A350 XWB formal launch at Airbus". Flight International. http://www.flightglobal.com/articles/2006/10/02/209601/a380-delay-puts-brakes-on-a350-xwb-formal-launch-at.html. Retrieved 23 May 2011.
  30. ^ Dinkloh, Peter (5 October 2006). "Airbus May Stop Work on Its A350 Plane, FT Deutschland Says". Bloomberg. Archived from the original on 4 June 2011. http://www.bloomberg.com/apps/news?pid=newsarchive&sid=aYeQTI21_ZDY&refer=germany. Retrieved 23 May 2011.
  31. ^ "CEO Streiff says A350 programme essential, but EADS board to decide".[dead link] Forbes. 5 October 2006
  32. ^ "Pegasus orders A350 XWBs, A330-200s". ATWonline.com. 5 January 2007. http://atwonline.com/aircraftenginescomponents/news/pegasus-orders-a350-xwbs-a330-200s-0309. Retrieved 22 May 2011.
  33. ^ "Airbus Unveils New A350 to Take on Boeing's 787." Bloomberg. 17 July 2006
  34. ^ "Airbus A350 Cost Rises to $15.4 Billion on Composites." Bloomberg. 4 December 2006
  35. ^ [1] Reuters
  36. ^ Robert Wall. "Airbus Delays A350 Final Assembly Start". Aviation Week. http://www.aviationweek.com/aw/generic/story_generic.jsp?channel=aviationdaily&id=news/avd/2010/04/20/05.xml&headline=Airbus%20Delays%20A350%20Final%20Assembly%20Start. Retrieved 1 July 2011.
  37. ^ A350 schedule slips but Airbus still aiming for 2013 entry
  38. ^ Norris, Guy (8 May 2006). "Airline criticism of Airbus A350 forces airframer to make radical changes to fuselage, wing and engines". Flight International. http://www.flightglobal.com/articles/2006/05/08/206441/airline-criticism-of-airbus-a350-forces-airframer-to-make-radical-changes-to-fuselage-wing-and.html. Retrieved 24 May 2011.
  39. ^ "Airbus rolls out XWB design revisions". Flight International, September 2001
  40. ^ "Airbus is at a crossroads on A350 design says ILFC". Flight International, March 2006.
  41. ^ "Metallic strips will ensure electrical continuity in A350 carbon". Flight International, September 2007
  42. ^ "PICTURE: Airbus builds 'physical mock-up' of XWB fuselage to avoid A380 mistakes". Flight International. Archived from the original on 3 May 2010. http://www.flightglobal.com/articles/2010/04/30/341328/picture-airbus-builds-physical-mock-up-of-xwb-fuselage-to-avoid-a380-mistakes.html. Retrieved 30 May 2010.
  43. ^ "Steinke, S. "Airbus Unveils A350 XWB". Flug Revue. September 2006.
  44. ^ "Farnborough: Airbus A350 powerplant race ignites as Rolls-Royce reaches agreement to supply Trent". Flight International, July 2006.
  45. ^ Patent 20090277445: System For Improving Air Quality In An Aircraft Pressure Cabin AIRBUS DEUTSCHLAND GMBH
  46. ^ "R-R prepares to ground-test Trent XWB ahead of A380 trials next year".
  47. ^ Thomas, Geoffrey (8 March 2007). "No GP7000 for A350 XWB-1000". atwonline.com. http://atwonline.com/aircraftenginescomponents/news/no-gp7000-a350-xwb-1000-0309. Retrieved 23 May 2011.
  48. ^ Doyle, Andrew (20 February 2008). "Singapore 2008: Pratt & Whitney pushes GP7000 as alternative A350 XWB engine". Flight International. http://www.flightglobal.com/articles/2008/02/20/221701/singapore-2008-pratt.html. Retrieved 11 November 2010.
  49. ^ Norris, Guy. "GEnx variant may yet power A350". Flight International, 24 April 2007.
  50. ^ Norris, Guy (20 April 2007). "Airbus lobbies General Electric to offer GEnx for A350 XWB". Flight International. http://www.flightglobal.com/articles/2007/04/20/213347/airbus-lobbies-general-electric-to-offer-genx-for-a350.html. Retrieved 27 May 2011.
  51. ^ "Airbus Says No To GEnx For A350 XWB". Aero-news.net. 7 June 2007. http://www.aero-news.net/index.cfm?ContentBlockID=191ded2c-3425-4c2f-987a-c4a4d0adfced. Retrieved 23 May 2011.
  52. ^ Ostrower, Jon (7 May 2009). "GE revives interest in A350 engine ahead of 787 flight test". Flight International. http://www.flightglobal.com/articles/2009/05/07/326164/ge-revives-interest-in-a350-engine-ahead-of-787-flight.html.
  53. ^ "Airbus selects Thales for A350 XWB cockpit avionics". Flight International January 2008
  54. ^ "A350 cockpit offers unprecedented suite of safety tools". Flight International. 2010. Archived from the original on 13 July 2010. http://www.flightglobal.com/articles/2010/07/06/344106/a350-cockpit-offers-unprecedented-suite-of-safety-tools.html. Retrieved 18 July 2010.
  55. ^ "BMW to design parts of Airbus A350 model, reportedly aircraft cabins". Forbes. 5 January 2006. http://www.forbes.com/feeds/afx/2006/01/05/afx2430232.html. Retrieved 23 May 2011.
  56. ^ Kingsley-Jones, Max (13 February 2009). "Airbus and partners gear up for A350 production". Flight International. http://www.flightglobal.com/articles/2009/02/13/322311/airbus-and-partners-gear-up-for-a350-production.html. Retrieved 27 May 2011.
  57. ^ "Airbus invest in A350 XWB wing line". Flight International. 30 March 2007. http://www.flightglobal.com/articles/2007/03/30/212959/airbus-invests-in-a350-xwb-wing-line.html. Retrieved 26 May 2011.
  58. ^ "£28 m investment at Airbus factory". BBC News. 19 June 2009. http://news.bbc.co.uk/2/hi/uk_news/wales/8107292.stm. Retrieved 23 May 2011.
  59. ^ Kaminski-Morrow, David (1 March 2011). "Airbus opens A350 composite rudder plant in China". Flight International. http://www.flightglobal.com/articles/2011/03/01/353740/airbus-opens-a350-composite-rudder-plant-in-china.html. Retrieved 3 June 2011.
  60. ^ "Airbus inaugurates Chinese facilities to produce A350 XWB components". Reinforcedplastics.com. 14 March 2011. http://www.reinforcedplastics.com/view/16584/airbus-inaugurates-chinese-facilities-to-produce-a350-xwb-components/. Retrieved 3 June 2011.
  61. ^ Kingsley-Jones, Max (12 June 2008). "Streamlined build plan will cut A350 XWB assembly time in half". Flight International. http://www.flightglobal.com/articles/2008/06/12/224611/streamlined-build-plan-will-cut-a350-xwb-assembly-time-in.html. Retrieved 3 June 2011.
  62. ^ Derber, Alex (4 December 2009). "PICTURE: Airbus manufactures first structural component for A350". Flight International. http://www.flightglobal.com/articles/2009/12/04/335826/picture-airbus-manufactures-first-structural-component-for-a350.html.
  63. ^ "Airbus in Spain begins production of A350 XWB components" (Press release). Airbus S.A.S.. 24 September 2010. http://www.airbus.com/no_cache/newsevents/news-events-single/detail/airbus-in-spain-begins-production-of-a350-xwb-components/archived-features/. Retrieved 27 May 2011.
  64. ^ Blachly, Linda (8 December 2010). "Airbus begins production of A350 XWB’s first fuselage barrel". http://atwonline.com/eco-aviation/news/airbus-begins-production-a350-xwb-s-first-fuselage-barrel-1207. Retrieved 26 May 2011.
  65. ^ Kingsley-Jones, Max (29 July 2010). "Airbus aims to finally start assembling first A350 centre wingbox in August". Flight International. http://www.flightglobal.com/articles/2010/07/29/345481/airbus-aims-to-finally-start-assembling-first-a350-centre-wingbox-in.html. Retrieved 11 November 2010.
  66. ^ Flight Global website
  67. ^ First Airbus A350 Hitches A Ride To the Factory. Wired.com
  68. ^ "Airbus starts final assembly of first A350 XWB" (Press release). Airbus S.A.S.. 5 April 2012. http://www.airbus.com/newsevents/news-events-single/detail/airbus-starts-final-assembly-of-first-a350-xwb/. Retrieved 28 October 2012.
  69. ^ a b "PARIS: A350-1000 delayed to 2017 as Rolls raises XWB thrust"
  70. ^ a b "Airbus delays A350 XWB entry as EADS profits triple". BBC
  71. ^ First ever microcutaway of Airbus' A350 XWB, Drawing Flightglobal
  72. ^ " Airbus to start manufacturing parts for new A350 XWB in late ’09". Engineering News online, 11 May 2009
  73. ^ "787 Dreamliner: Program Fact Sheet". Boeing. http://www.boeing.com/commercial/787family/programfacts.html.
  74. ^ Taking the lead: A350XWB presentation[dead link] EADS
  75. ^ Kaminski-Morrow, David (8 January 2008). Flight International. Airbus studying 350min ETOPS for A350 at service entry. Retrieved 23 May 2011.
  76. ^ a b c Gunston 2009, p. 257
  77. ^ "Specifications Airbus A330-200". Airbus S.A.S.. http://www.airbus.com/aircraftfamilies/a330a340/a330-200/specifications/. Retrieved 23 May 2011.
  78. ^ Airbus unveils mock up XWB cabin Flight International September 2007
  79. ^ Guru, Seat. "American Airlines 9 across 777 Economy Seat Map". TripAdvisor. http://www.seatguru.com/airlines/American_Airlines/American_Airlines_Boeing_777-200_A.php. Retrieved 11/8/12.
  80. ^ Advisor, Trip. "United 787-800 Seat Map". Seat Guru. http://www.seatguru.com/airlines/United_Airlines/United_Airlines_Boeing_787-800.php.
  81. ^ Guru, Seat. "Emirates 777-300 seat map (10 across economy)". TripAdvisor. http://www.seatguru.com/airlines/Emirates_Airlines/Emirates_Airlines_Boeing_777-300_3class.php. Retrieved 11/8/12.
  82. ^ "Why new wing is key A350 XWB". Flight International, 12 December 2006
  83. ^ a b c d e "A350-800 specifications". Airbus S.A.S.. http://www.airbus.com/aircraftfamilies/passengeraircraft/a350xwbfamily/a350-800/specifications/. Retrieved 18 May 2012.
  84. ^ "Technical Characteristics – Boeing 777-200LR and 777-300ER". Boeing. Archived from the original on 24 May 2011. http://www.boeing.com/commercial/777family/pf/pf_lrproduct.html. Retrieved 24 May 2011.
  85. ^ "Airbus A350 wing aerodynamics advance". Flight International, May 2007
  86. ^ "PICTURES: Airbus refines A350 aerodynamic configuration". Flight International, June 2008
  87. ^ Kingsley-Jones, Max (20 January 2009). "Airbus prepares for A350 production following definition freeze". Flight International. http://www.flightglobal.com/articles/2009/01/20/321112/airbus-prepares-for-a350-production-following-definition.html. Retrieved 23 May 2011.
  88. ^ "Airbus opens A350 wing factory at Broughton, Flintshire". BBC News. 13 October 2011. http://www.bbc.co.uk/news/uk-wales-north-east-wales-15275906.
  89. ^ "Airbus confirms switch to A380 style nose for A350 XWB". Flight International, September 2007
  90. ^ a b c Gunston 2009, p. 258
  91. ^ "A350 could have composite nose". Flight International, December 2006
  92. ^ "Airbus reveals all new A350 XWB flightdeck design". Flight International, September 2007
  93. ^ "A350 avionics to expand on A380 system". Flight International, July 2007
  94. ^ "A350 avionics to expand on A380 systems". Flight International, July 2007
  95. ^ Kingsley-Jones, Max (29 April 2010). "R-R prepares to ground-test Trent XWB ahead of A380 trials next year". Flight International. http://www.flightglobal.com/articles/2010/04/29/341141/r-r-prepares-to-ground-test-trent-xwb-ahead-of-a380-trials-next.html.
  96. ^ "Airbus A350 XWB set to be quietest generation of airliner as manufacturer improves zero splice". Flight International, January 2007
  97. ^ "Honeywell wins first contract to supply systems for Airbus A350 XWB". Flight International, September 2007
  98. ^ "Hamilton Sundstrand to supply Ram Air Turbine for A350 XWB"
  99. ^ "Parker wins $2 billion system contract for the A350". Flight International, January 2008
  100. ^ Airbus adopts VC-10 undercarriage concept for A350 XWB. Flight International, May 2007
  101. ^ Extended range A350-900R adopts -1000 six-wheel-gear. Flight International, March 2007
  102. ^ "Messier-Dowty Confirmed as A350 XWB Main Gear Supplier". Flight International, December 2007
  103. ^ a b c Airbus opts for larger wing on A350-1000 through trailing edge extension FlightGlobal.com. Retrieved 6 May 2010
  104. ^ Aircraft Profile: Airbus A350. FlightGlobal.com. Retrieved 25 December 2008.
  105. ^ La mise en service de l'A350-800 et l'A350-1000 désormais prévue en 2016 et 2017. latribune.fr
  106. ^ a b "Qatar Airways backs Airbus rethink on A350-800 design". Flight International. http://www.flightglobal.com/articles/2010/01/15/337132/qatar-airways-backs-airbus-rethink-on-a350-800-design.html. Retrieved 30 May 2010.
  107. ^ Airbus focuses on family commonality as it begins A350-800 detailed design FlightGlobal.com. Retrieved 6 May 2010
  108. ^ a b c d Flight International 4–10 May 2010 Page 10 "A350-800 takes centre stage"
  109. ^ Kingsley-Jones, Max (30 July 2010). "Airbus works to introduce lighter A350 structure with -800 variant". Flight International. http://www.flightglobal.com/articles/2010/07/30/345444/airbus-works-to-introduce-lighter-a350-structure-with-800.html. Retrieved 11 November 2010.
  110. ^ John Leahy presentation at Paris Le Bourget 2007 Air Show. Airbus
  111. ^ "Extended range A350-900R adopts -1000 six-wheel-gear". Flight International, March 2007
  112. ^ "The Market for Large Commercial Jet Transports 2011-2020". Forecast International, July 2011.
  113. ^ a b "A350-1000 specifications". Airbus S.A.S.. http://www.airbus.com/aircraftfamilies/passengeraircraft/a350xwbfamily/a350-1000/specifications/. Retrieved 18 May 2012.
  114. ^ a b c d Orders and Deliveries page, Orders and Deliveries spreadsheet. Airbus, October 2012. Retrieved 14 November 2012.
  115. ^ a b Airbus A350 XWB[dead link] EADS
  116. ^ a b "A350-900 specifications". Airbus S.A.S.. http://www.airbus.com/aircraftfamilies/passengeraircraft/a350xwbfamily/a350-900/specifications/. Retrieved 18 May 2012.
  117. ^ Kingsley-Jones, Max (10 June 2008). "A350 weight growth will result in 1% fuel penalty: Airbus". Flight International. http://www.flightglobal.com/articles/2008/06/10/224578/a350-weight-growth-will-result-in-1-fuel-penalty-airbus.html. Retrieved 24 May 2011.
  118. ^ Kingsley-Jones, Max (12 December 2006). "Airbus's A350 vision takes shape – Flight takes an in-depth look at the new twinjet". Flight International. http://www.flightglobal.com/articles/2006/12/12/211028/airbuss-a350-vision-takes-shape-flight-takes-an-in-depth-look-at-the-new.html. Retrieved 24 May 2011.

Thursday, January 10, 2013

Boeing 787 Service entry and operations -1.2013

Service entry and operations
The 787-8 received FAA and EASA certification on August 21, 2011.
Regulatory certification of the 787 cleared the way for deliveries to begin.[146] With the first deliveries at hand, Boeing began preparations to increase 787 production rates from two to ten aircraft per month over the next two years.[146] Production is taking place at assembly lines in Everett and Charleston. The Charleston site's contributions have been clouded by legal difficulties; on April 20, 2011, the National Labor Relations Board alleged that Boeing's second production line in South Carolina violated two sections of the National Labor Relations Act.[94] This labor dispute ended in December 2011 when the National Labor Relations Board dropped its lawsuit after the Machinists union withdrew its complaint as part of a new contract with Boeing.[148] The first 787 assembled at the South Carolina facility was rolled out on April 27, 2012.[149]
The first 787 was officially delivered to All Nippon Airways on September 25, 2011, at Boeing's facilities in Everett, Washington. A ceremony to mark the occasion was also held the next day.[150][151] On September 27, the Dreamliner flew to Haneda Airport.[152][153] The airline took delivery of the second 787 on October 13, 2011.[154]
On October 26, 2011, the 787 flew its first commercial flight from Narita to Hong Kong on All Nippon Airways.[155] The airliner was planned to enter service some three years prior. Tickets for the flight were sold in an online auction, with the highest bidder paying $34,000 for a seat.[156] The 787 flew its first commercial long-haul flight on January 21, 2012 from Haneda to Frankfurt on All Nippon Airways.[157]
On December 6, 2011, test aircraft ZA006 (sixth 787 built), powered by General Electric GEnx engines, flew 10,710 nautical miles (19,830 km) non-stop from Boeing Field eastward to Shahjalal International Airport in Dhaka, Bangladesh, setting a new world distance record for aircraft in the 787's weight class, which is between 440,000 pounds (200,000 kg) and 550,000 pounds (250,000 kg). This flight surpassed the previous record of 9,127 nautical miles (16,903 km), set in 2002 by an Airbus A330. The Dreamliner then continued eastbound from Dhaka to return to Boeing Field, setting a world-circling speed record of 42 hours, 27 minutes.[158]
In late 2011, Boeing began a 787 world tour to promote the airliner. It has visited cities in China, Africa, the Middle East, Europe, United States, and others.[159][160][161]
Data from ANA reported that the 787 surpasses the 20% fuel burn reduction promised by Boeing as compared to the 767. On the Tokyo-Frankfurt route the fuel savings was 21%.[162] As part of this report the passenger experience was also rated. 90% of passengers said it surpassed their expectations and 25% said they would go out of their way to fly the 787 again. Air quality and cabin pressure met or exceeded expectations for nine in ten passengers, and 92% of passengers reported that the cabin ambience was as good or better than they expected. Higher humidity levels in the cabin met or exceeded expectations for 80% of passengers. Four in ten said headroom was better than expected. Finally, the large windows met or surpassed expectations of 90% of passengers. ANA surveyed 800 passengers who flew the 787 from Tokyo to Frankfurt.[163]
Qatar Airways placed its first 787 on display at the Farnborough Airshow in July 2012. The airline was to officially receive the aircraft in August.[164]
On September 15, 2012, the NTSB requested the grounding of certain 787s due to GE engine failures; GE believes the production problem has already been fixed.[165]
On November 25, 2012, it was reported that Air India had requested a team of Boeing engineers come to India to address issues described as "teething problems" with its aircraft.[166]
In the Dreamliner's first year of service, at least four aircraft suffered from electrical systems problems. Boeing CEO James McNerney told media outlets that the problems were no greater than those experienced by the company with the introduction of other new models, such as the Boeing 777.[167] On January 7, 2013, a battery overheated and started a fire in an empty 787 operated by Japan Airlines (JAL) at Boston's Logan International Airport.[168][169] A second 787 also operated by JAL experienced a fuel leak on January 8, and its flight from Boston was canceled.[170] On January 9, United Airlines reported a problem in one of its six 787s with the wiring in the same area as the battery fire on JAL's airliner; the U.S. National Transportation Safety Board subsequently opened a safety probe.[171]

Tuesday, January 8, 2013

IN THE MATTER OF HARRY DANIELS ET AL v. HER MAJESTY THE QUEEN ET AL Summary:


Ottawa, January 8, 2013


– A decision was issued today by the Honourable Michael




IN THE MATTER OF HARRY DANIELS ET AL v. HER MAJESTY THE

QUEEN ET AL

Summary:


The Plaintiffs ask the Court to issue the following declarations:


(a) that Métis and non-status Indians are “Indians” within the meaning of the expression

“Indians and lands reserved for Indians” in s 91(24) of the


Constitution Act, 1867;


(b) that the Queen (in right of Canada) owes a fiduciary duty to Métis and non-status

Indians as Aboriginal people;

(c) that the Métis and non-status Indian peoples of Canada have the right to be consulted

and negotiated with, in good faith, by the federal government on a collective basis

through representatives of their choice, respecting all their rights, interests and needs as

Aboriginal peoples.


Upon review of the evidence on the record, the Court grants the declaration with respect

to section 91(24); the other two declarations, ancillary in nature, are dismissed.

****